aecHive

Cover image for Coordinated MEP BIM Model Drives High Efficiencies in Californian Public Park Project
Hitech CADD Services
Hitech CADD Services

Posted on • Updated on

Coordinated MEP BIM Model Drives High Efficiencies in Californian Public Park Project

A top-tier construction firm from California, USA approached Hitech CADD Services for BIM modeling requirements regarding a large and complex public park project. The project was initiated with PDF files and conceptual hand-drawn sketches provided as input from the client. The team of experts at Hitech CADD Services carefully analyzed and integrated the IFC drawings & PDF files shared by the client into the modeling process.

Eliminating interdisciplinary clashes through alternate design, and keeping the architectural aesthetics intact, a 3D BIM model at LOD 300 was developed based on AIA regulations. This led to a significant business impact for the client through rework reduction, diminished material waste, negative clash-flow mitigation, improved scheduling, and accurate BOQ/BOMs.

Watch the full video: https://www.youtube.com/watch?v=JdM8VEIW-Io

Need greater project efficiency? Outsource your clash-resolution requirements to Hitech CADD Services for timely and accurate deliverables.

Click on the link to learn more: https://bit.ly/3DAdhXC

Discussion (0)